DISA wants to refresh its network with next-gen transport tech

The Defense Information Systems Agency is seeking next-generation transport technologies for the Defense Department's information network, according to a procurement notice issued this month.

In a request for information posted Feb. 8 on the FedBizOpps website, the agency wants to evolve the Defense Information Systems Network (DISN) into an IP/ethernet/optical services that are supported by next-generation technologies. The goal is to integrate functions as much as possible physically or at a minimum operationally.

The transport technologies currently used in DISN need to be technology refreshed due to the expected end of life, capacity exhaust, higher bandwidth service requirements,  total cost of ownership, and network resiliency and service agility, according to the notice.

Specifically, DISA plans to replace synchronous optical networking/synchronous digital hierarchy (SONET/SDH) networking protocol with packet-based multiprotocol label switching, MPLS-TP and optical transport networking (G.709) grooming and switching, the notice said.

DISN is a composite of Defense Department-owned and leased telecommunications networks and subsystems operated by DISA. The network serves as the DOD's global enterprise telecommunications infrastructure, providing  end-to-end services in support of military operations and national security.

As a critical component of the Global Information Grid (GIG), DISN contributes to the DISA enterprise infrastructure by connecting deployed warfighters to each other and to their bases, connecting U.S. forces to their coalition partners, and connecting the DOD intelligence and federal, state, and local agencies.

Responses are due March 7.

About the Author

William Welsh is the managing editor of Defense Systems. Follow him on Twitter: @WilliamWelsh12.

Reader Comments

Please post your comments here. Comments are moderated, so they may not appear immediately after submitting. We will not post comments that we consider abusive or off-topic.

Your Name:(optional)
Your Email:(optional)
Your Location:(optional)
Comment:
Please type the letters/numbers you see above

Webcast

  • Improving Performance Management and Project Control to Meet Cost/Schedule Milestones in DoD Procurement

    It can be nearly impossible to build annual budgets that consider forecasted project and program work plans along with detailed cost data, particularly when attempting to reconcile actual and projected program costs with actual schedule performance. In this webcast, a defense IT program manager will share best practices and hard-won lessons aligning critical data on project performance, cost systems and schedules for truly big picture program management insight. Read more